Inspection, Installation and Start-Up two Gas Turbines Manturbo-THM-1304-12

Home / Services

Inspection, Installation and Start-Up two Gas Turbines Manturbo-THM-1304-12

Client : SGC “Syrian Gas Company “/ South gas plant “SMAG”

Statue : project was completed 2025, in warranty period (12-2026).

Scope of work:  

There are 2 gas turbines Manturbo – THM-1304-12 Mw at south gas plant, turbine B”841” was damaged at 2010 and it was out of service that time and turbine A”811” was tripped and out of service from 2016. The scope of project includes the following